
Construction has begun on the $94 million Montgomery Intermodal Container Transfer Facility (ICTF), a strategic logistics infrastructure project announced by the Alabama Port Authority and State of Alabama. The project, underway since February 2025 groundbreaking, represents a critical investment in regional freight mobility and supply chain connectivity, with completion expected in 2027.
The Montgomery ICTF will establish direct rail and truck connectivity between central Alabama and the Port of Mobile, creating a vital gateway for regional commerce and enhancing freight mobility across the Southeast. The facility addresses a strategic transportation gap, linking CSX Intermodal with the deep-water Port of Mobile for containerized cargo handling.
According to Doug Otto, Alabama Port Authority interim director and CEO, the project represents unprecedented regional economic opportunity: "This is one of the most exciting economic development projects under way in the state. It represents a strategic investment in statewide logistics that will strengthen supply chains, attract new industry and create opportunity across the Southeast."
The project's economic implications are already evident. Since the project was announced three years ago, the area surrounding the facility has attracted more than $3 billion in economic development investments from private companies—demonstrating private sector confidence in the region's logistics future.
The facility is positioned on a 272-acre greenfield site with direct access to Interstate 85 and Highway 31, providing optimal connectivity for multi-modal freight operations. The location's strategic positioning makes it attractive for manufacturing, automotive, and distribution-dependent industries considering Alabama as a headquarters or operations location.
The Montgomery ICTF will feature comprehensive container handling infrastructure:
As of December 2025, construction is advancing through critical site preparation phases. According to Jeff Hanak, Ragnar Benson Construction project executive, progress includes:
Completed Work:
Remaining Tasks:
The project faces specific site conditions requiring specialized engineering. The native soils presented construction challenges, necessitating lime stabilization to prepare the subgrade—a critical decision from the project's geotechnical engineer. The site's active CSX mainline creates coordination requirements, with the Port Authority building a 3-mile rail siding and bridge for CSX while maintaining safe operations alongside active rail lines.
Weather posed additional challenges, particularly in June 2025 when record high rainfall impacted production. Completion of critical stormwater conveyance infrastructure has mitigated weather-related delays going forward.
Approximately 500,000 cubic yards of dirt will be moved during construction, utilizing major earth-moving equipment including tractor and pan scrapers, articulating dump trucks, bulldozers, and a Caterpillar 825 compactor. Materials include significant stone volumes for pavement subbase and sub-ballast, plus electrical systems, watermain, hydrants, sanitary sewer, and stormwater infrastructure.
The facility will feature advanced container handling equipment. In September 2025, the Port Authority announced its contract with Konecranes for delivery of two rubber-tired gantry (RTG) cranes, which will serve as the backbone for container handling at the ICTF. The Konecranes RTGs feature smart technologies to enhance safety, accuracy and yard efficiency, helping to streamline container transfers between rail and truck. Delivery is scheduled for late 2026.
The facility also incorporates roller compacted concrete pavement, a specialized and durable pavement type perfectly suited for container yard operations. This material is installed using asphalt-like methods but provides concrete's durability and strength benefits—a modern approach to heavy-duty infrastructure surfaces.
The Montgomery ICTF will significantly enhance the Port of Mobile's competitive position and operational efficiency. With the harbor deepening project creating additional cargo volume, the intermodal facility relieves stress on the interstate system by providing rail alternatives for freight distribution into central Alabama. The Port Authority serves every county in Alabama and oversees deep-water public port facilities at Mobile, with immediate access to:
The Montgomery ICTF completion in 2027 will create new freight routing options and logistics efficiency across the Southeast. For contractors and construction companies, improved rail access to container ports reduces supply chain costs and improves material availability. For manufacturers and distribution companies, the facility opens competitive location advantages in central Alabama with direct port access. The project demonstrates Alabama's strategic commitment to logistics infrastructure and positions the state as a destination for supply-chain-dependent industries.
Sources: Construction Equipment Guide (December 3, 2025), Alabama Port Authority, Ragnar Benson Construction
Frederick Douglass Greater Rochester International Airport completes $38M transformational revitalization with new terminal, security, and infrastructure upgrades.
Rochester begins 18-24 month remediation of 13.5-acre Vacuum Oil brownfield site with plans for riverfront park and development upon completion.
Excelsior Communities converting three floors of historic Columbus Building into 30 new apartments, adding $7.9M investment to downtown Rochester revitalization.