Background

Pilot Flying J required a new EV charging station installation to support growing demand for electric vehicle infrastructure across travel and transportation corridors. The project needed to accommodate high daily traffic while maintaining safe vehicle circulation and reliable site operations.

The scope included site preparation, utility coordination, equipment installation, concrete work, and integration with existing facility access points.

Challenge

The project required careful coordination around an active commercial site where customers, staff, and vehicles continued to move through the property. Utility access, traffic flow, safety barriers, and installation sequencing needed to be planned in detail.

Because EV infrastructure depends heavily on reliable electrical systems, the team also needed to coordinate closely with utility providers and technical partners to avoid delays and ensure accurate installation.

Solution

Westside developed a construction plan that prioritized safety, traffic management, and efficient site execution. Work zones were clearly separated from active customer areas, and each installation phase was coordinated to reduce disruption to daily operations.

Through proactive scheduling, utility coordination, and quality control, the team helped deliver a charging station built for dependable performance and long-term infrastructure growth.

Testimonial
“Westside kept the project organized from planning through installation. Their team understood how to work safely around an active site while keeping the schedule moving.”
- Michael Reeves
,
Regional Facilities Manager
OTHER CASE STUDIES

Explore More Case Studies

All Case Studies
May 1, 2026

Manufacturing Plant Storm Valve Installation

Stormwater system improvement for a manufacturing facility to support drainage performance and operational resilience.
Read Post
May 1, 2026

National Grid Syracuse

Utility infrastructure construction supporting mission-critical energy operations with a focus on safety and precision.
Read Post
May 1, 2026

Pharmaceutical Lab Cleanroom Renovation

Specialized renovation for a controlled laboratory environment with strict safety, cleanliness, and compliance requirements.
Read Post
All Case Studies
GET IN TOUCH
[
Get In Touch
]

Discuss an Upcoming Project

If you are planning work in a commercial, industrial, or infrastructure environment, we are available to review the project and discuss the right approach.