Pilot Flying J required a new EV charging station installation to support growing demand for electric vehicle infrastructure across travel and transportation corridors. The project needed to accommodate high daily traffic while maintaining safe vehicle circulation and reliable site operations.
The scope included site preparation, utility coordination, equipment installation, concrete work, and integration with existing facility access points.
The project required careful coordination around an active commercial site where customers, staff, and vehicles continued to move through the property. Utility access, traffic flow, safety barriers, and installation sequencing needed to be planned in detail.
Because EV infrastructure depends heavily on reliable electrical systems, the team also needed to coordinate closely with utility providers and technical partners to avoid delays and ensure accurate installation.
Westside developed a construction plan that prioritized safety, traffic management, and efficient site execution. Work zones were clearly separated from active customer areas, and each installation phase was coordinated to reduce disruption to daily operations.
Through proactive scheduling, utility coordination, and quality control, the team helped deliver a charging station built for dependable performance and long-term infrastructure growth.