Westside Construction Group completed a detailed cleanroom renovation within the Unither Pharmaceuticals Delsym Lab, including ceiling framing, selective demolition, drywall reinstallation, painting, fire-stopping, and final detailing. All work was performed under stringent cleanroom protocols, requiring contamination control, specialized PPE, and tight scheduling to avoid disrupting active pharmaceutical operations.
Remove targeted ceiling and wall components without contaminating adjacent lab processes.
Install new framing to support lab mechanical systems and future equipment loads.
Hang, tape, and finish drywall with smooth surfaces suitable for cleanroom finishes.
Install UL-rated fire caulk and sealing around utilities and MEP penetrations.
Apply cleanroom-approved coatings with smooth, sterile finishes.
Conduct thorough HEPA-level cleaning and ensure the space meets GMP expectations.
The Unither Delsym Lab Renovation highlights Westside Construction Group’s precision and discipline in regulated spaces. Our team delivered cleanroom-quality framing, drywall, and finishes on a tight timeline while maintaining strict contamination control—reinforcing our reputation for excellence in pharmaceutical environments.
Perform a controlled cleanroom renovation—including framing, drywall, finishes, and fire penetrations—while maintaining strict contamination controls and completing the work within an accelerated pharmaceutical production timeline.