Healthcare & Life Sciences

Unither Delsym Lab

Project Overview

Westside Construction Group completed a detailed cleanroom renovation within the Unither Pharmaceuticals Delsym Lab, including ceiling framing, selective demolition, drywall reinstallation, painting, fire-stopping, and final detailing. All work was performed under stringent cleanroom protocols, requiring contamination control, specialized PPE, and tight scheduling to avoid disrupting active pharmaceutical operations.

01
Selective Cleanroom Demolition

Remove targeted ceiling and wall components without contaminating adjacent lab processes.

02
Ceiling Framing & Structural Reinforcement

Install new framing to support lab mechanical systems and future equipment loads.

03
Drywall Reinstallation & Patching

Hang, tape, and finish drywall with smooth surfaces suitable for cleanroom finishes.

04
Fire-Stopping & Penetration Sealing

Install UL-rated fire caulk and sealing around utilities and MEP penetrations.

05
High-Standard Painting & Finish Work

Apply cleanroom-approved coatings with smooth, sterile finishes.

06
Final Clean & Turnover

Conduct thorough HEPA-level cleaning and ensure the space meets GMP expectations.

Project Benefits

  • Zero Contamination Events: All work performed in active cleanroom environments without impacting production.
  • Compliance Ready: Fire-stopping, coatings, and finishes fully meet pharmaceutical standards.
  • Fast Turnaround: Completed work on a restricted, accelerated schedule.
  • Cleanroom Expertise: Teams trained for controlled environments and contamination management.
  • Improved Operational Efficiency: Renovated ceiling and walls support safer, cleaner workflows.
  • Seamless Coordination: Worked closely with Unither engineering and QC teams.

Conclusion

The Unither Delsym Lab Renovation highlights Westside Construction Group’s precision and discipline in regulated spaces. Our team delivered cleanroom-quality framing, drywall, and finishes on a tight timeline while maintaining strict contamination control—reinforcing our reputation for excellence in pharmaceutical environments.

Project Objective

Perform a controlled cleanroom renovation—including framing, drywall, finishes, and fire penetrations—while maintaining strict contamination controls and completing the work within an accelerated pharmaceutical production timeline.