National Grid Syracuse Substation

Project Overview

At National Grid’s Lafayette Substation in Syracuse, NY, Westside Construction Group provided full general contracting services for substation expansion and modernization. The project included deep foundation installation for new monopoles, site development, and the complete construction of a switchgear building and generator shed. Westside coordinated all excavation, concrete, steel, and electrical scopes, delivering a fully integrated civil and structural package in line with National Grid’s safety and quality protocols.

01
Preconstruction Management & Permitting

Coordinate with National Grid engineers on foundation design, structure placement, and environmental compliance before mobilization.

02
Site Development & Excavation

Perform grading, trenching, and subgrade stabilization for monopole and building foundations while maintaining erosion control compliance.

03
Foundation & Concrete Construction

Install deep, reinforced concrete foundations with embedded anchor assemblies to support transmission poles and heavy equipment.

04
Switchgear Building Construction

Construct a concrete foundation and pre-engineered structure housing electrical switchgear, with integrated grounding and conduit routing.

05
Generator Shed Installation

Pour foundation, assemble structure, and install coordination pads for backup generation systems supporting the substation.

06
Testing, Quality Control & Restoration

Conduct structural, concrete, and grounding tests before final grading, paving, and site restoration per National Grid and NYS standards.

Project Benefits

  • Comprehensive Substation Delivery: Full GC control over all civil and building scopes.
  • Resilient Energy Infrastructure: Integrated generator and switchgear facilities enhance reliability and response capability.
  • Utility Compliance: All work executed under National Grid’s safety and environmental programs.
  • Coordinated Construction: Multi-trade synchronization ensured schedule adherence and zero operational disruption.
  • Proven Reliability: Every pour and structure passed inspection on first review.
  • Optimized Schedule: Completed safely within the outage coordination window.

Conclusion

The National Grid Substation project demonstrates Westside Construction Group’s ability to manage full-site and structural substation builds from concept to completion. Through meticulous coordination and hands-on field leadership, Westside delivered critical infrastructure—including switchgear and generator facilities—built to meet the utility’s demanding safety, reliability, and performance standards.

PROJECTS

Explore More Projects

See More Projects
May 27, 2026

Senior Living Administrative Office Renovation

Read Post
May 27, 2026

Emergency Water Main Reconstruction in Manufacturing Facility

Read Post
May 5, 2026

AMR Regional Operations Hub

Read Post
See More Project
GET IN TOUCH
[
Get In Touch
]

Discuss an Upcoming Project

If you are planning work in a commercial, industrial, or infrastructure environment, we are available to review the project and discuss the right approach.