The L3 Harris Conduit Installation project in Rochester, NY, delivered end-to-end preconstruction management, permitting, and installation of communication and electrical conduits beneath University Avenue. Using Horizontal Directional Drilling (HDD) and selective trenching through congested utility corridors, we installed heavy-gauge galvanized conduit, pull boxes, and building penetrations, then restored and resurfaced the roadway to city standards.
Coordinate design reviews, utility locates, and city permitting to ensure all phases aligned with client and municipal requirements.
Drill beneath University Avenue to place communication and electrical conduit without open-cut disruption to traffic flow.
Excavate only where necessary to navigate existing water, gas, and electrical mains—minimizing risk to critical infrastructure.
Install two reinforced pull boxes in landscaped areas and create sealed penetrations in the L3 Harris building using hydraulic cement.
Fit and secure galvanized conduit rated for high-voltage and communications lines, ensuring long-term durability and code compliance.
Mill, repave, stripe, and landscape all disturbed public and private areas to City of Rochester standards for safety and aesthetics.
The L3 Harris Conduit Installation project exemplifies Westside Construction Group’s ability to manage complex, utility-dense installations with minimal disruption and maximum reliability. From meticulous preconstruction planning to precision HDD and faultless roadway restoration, we delivered a turnkey solution that enhances L3 Harris’s communication infrastructure and elevates the local streetscape. Contact us to learn how our expertise can streamline your next high-stakes utility project.
Deliver a fully permitted, HDD-based conduit pathway beneath University Avenue and targeted trenching across a utility-dense corridor to connect communication and electrical lines—while maintaining traffic flow, safeguarding existing utilities, and fully restoring the roadway to City of Rochester standards.